T
Services
Buildings
0
Technology Construction Cost
$
0
AEC provided technology engineering design for three new elementary schools, totaling 168,000 SQ FT, in the Lakewood City School District. Technology designs were provided per the 2014 edition of the Ohio School Design Manual. Technology systems designed included audio/video systems, data/telecommunication, fiber backbone, data network, VoIP telephone system, video distribution, sound and paging, CCTV, and intrusion detection systems. Construction drawings were prepared using Autodesk Revit. The schools were designed to meet LEED Silver certification. Total construction cost for the three new elementary schools was $38M.