Watkins Elementary School

MEP

Services
Square Footage
0
Construction Cost
$ 0

AEC provided professional engineering design services for the replacement of the existing boilers at the Watkins Elementary School. The project required designing a phased renovation plan that accommodated ongoing school operations during construction. The project included the installation of two cast iron gas-fired boilers, design of new DDC control to monitor boiler, heating hot water pumps, compressed air system for DDC control, new stacks and combustion air system.