Infrastructure

COTA EV Charging Stations

E Services Transit Sites 0 Total Construction Cost $ 0 AEC was contracted for three projects to support COTA’s efforts to add electrical vehicle charging stations at park and ride sites and transit centers across the city. For each project, AEC evaluated the sites for feasibility and required power for the installation of Level 2

COTA EV Charging Stations Read More »

CRAA Utility Corridor Relocation

E Services Construction Budget $ 0 To support the airport’s master plan, the underground utilities in the mid-field area of the airport required relocation and upgrade. Utilities in the area included gas, water, sanitary, electrical and communications cabling. This project enabled the site for development of a new consolidated rental car facility, a new parking

CRAA Utility Corridor Relocation Read More »

NASA Compressed Air Projects

MEP Services Square Footage 0 Construction Cost $ 0 AEC was retained to provide engineering design services that provides for critical repairs to and refurbishment of Central Compress Air System equipment at Glenn Research Center. The services included design for compressor and dryer equipment, auxiliary systems, piping, and associated controls. The design team developed P&ID’s

NASA Compressed Air Projects Read More »

NASA Utility Plan Study and Renovations

MEP Services Square Footage 0 Construction Cost $ 0 AEC performed a study at NASA’s Glenn Research Center to determine a recommended long- term method to deliver a means of heating and cooling to NASA’s buildings on campus. The campus’s utility infrastructure, which included a centralized steam and chilled water distribution system, was aging and

NASA Utility Plan Study and Renovations Read More »

WPAFB Peak-Shaving Generator Study

MEP Services Square Footage 0 Construction Cost $ 0 As part of a 5-year, $3.5M IDIQ contract with Wright-Patterson Air Force Base, AEC was tasked with conducting a peak-shaving study for the Air Force Research Laboratory. The purpose of this study was to investigate the needs of AFRL, examine the feasibility and costs of installing

WPAFB Peak-Shaving Generator Study Read More »

City Hall Chilled Water Study

MEP Services Square Footage 0 Construction Cost $ 0 AEC conducted a study for the City of Columbus to evaluate various options for generating chilled water to serve the cooling needs of several buildings downtown. A base case consisting of decentralized chilled water plants for each building was developed along with three alternatives for central

City Hall Chilled Water Study Read More »

NASA Electrical Distribution Report

MEP Services Square Footage 0 Construction Cost $ 0 AEC was recently retained to complete a PER for the NASA High Voltage System Phase 3 project. The intent of this project was to provide the required investigations, studies, and design services to complete a Preliminary Engineering Report (PER), in accordance with the requirements in the

NASA Electrical Distribution Report Read More »