Portfolio

Wexner Medical Center Commissioning

CxA Services Buildings 0 Construction Cost $ 0 AEC was part of a team contracted to provide mechanical and electrical commissioning services for three projects totaling over $600M construction for OSU͛s Wexner Medical Center. The first project was a new 22- story, 1.2 million square foot hospital that included three floors of Critical Care patient […]

Wexner Medical Center Commissioning Read More »

Columbus City Schools Clinton Elementary School Renovation / Addition

MEPT Services Square Footage 0 Construction Cost $ 0 AEC was part of a team that was selected to provide A/E services for the renovation and an addition to the historic Clinton Elementary School. AEC was responsible for providing mechanical, plumbing, electrical, and technology engineering design services for this renovation and addition. The historic 55,000

Columbus City Schools Clinton Elementary School Renovation / Addition Read More »

Watkins Elementary School

MEP Services Square Footage 0 Construction Cost $ 0 AEC provided professional engineering design services for the replacement of the existing boilers at the Watkins Elementary School. The project required designing a phased renovation plan that accommodated ongoing school operations during construction. The project included the installation of two cast iron gas-fired boilers, design of

Watkins Elementary School Read More »

Newton K-12 School

MEP Services Square Footage 0 Construction Cost $ 0 AEC was part of a team that was selected to provide engineering design and construction administration services for a new 87,321 square foot, K-12 school building. AEC was responsible for providing mechanical, electrical, plumbing, and technology system design for the new facility. Areas to be used

Newton K-12 School Read More »

McPherson Middle School

MEP Services Square Footage 0 Construction Cost $ 0 One of the first projects to be affected by the state of Ohio’s LEED Silver mandates, the new 85,934 square foot McPherson Middle School took sustainable design just a little bit further and achieved LEED Gold certification. Sustainable highlights include daylighting monitors and a displacement ventilation

McPherson Middle School Read More »

Elgin K-12 School

MEP Services Square Footage 0 Construction Cost $ 0 AEC provided electrical design services for this new 171,890 square foot, two-story K-12 school facility. AEC was responsible for complete electrical design, including production of documents and preparation of LEED templates for Sustainable Site Credit SSc8, Indoor Environmental Quality Credit Eqc6.1. The total construction cost for

Elgin K-12 School Read More »

Wedgewood Middle School

MEP Services Square Footage 0 Construction Cost $ 0 AEC was retained to provide MEPT engineering design and construction administration services for the new Wedgewood Middle School. The new, $15.2M, 87,152 square foot school building includes academic learning space, special education space, gymnasium, library, cafeteria / food service area, physical education, media space, technology education,

Wedgewood Middle School Read More »

Hopewell-Loudon PK-12 School

MEP Services Square Footage 0 Construction Cost $ 0 AEC provided plumbing and fire protection engineering designs for the new 127,000 square-foot Hopewell-Loudon Pk-12 school. All designs were in compliance with all applicable requirements of the 2010 Ohio School Facilities Commission Design Manual and the Ohio Plumbing Code. The fire protection design included fire suppression

Hopewell-Loudon PK-12 School Read More »

Champion Middle School

MEP Services Square Footage 0 Construction Cost $ 0 AEC provided complete M/E/P/T engineering design services for the new 73,880 square foot Champion Middle School in Columbus, OH. Services included power distribution, HVAC, plumbing, fire protection, fire alarm, technology, lighting, system control, data/communications, security and sound systems. AEC also provided construction administration duties that included

Champion Middle School Read More »

Lincoln Park Elementary School

MEP Services Square Footage 0 Construction Cost $ 0 AEC provided complete M/E/P/T engineering design services for the new 51,000 square foot Lincoln Park Elementary School. AEC was responsible for designing the electrical power distribution, HVAC, plumbing, fire protection, technology, lighting, system control, data/telecommunications, security and sound systems. Construction cost was $7.5 million.

Lincoln Park Elementary School Read More »

OSU Archer House Renovation

MEP Services Square Footage 0 Construction Cost $ 0 AEC was part of a team that provided architectural and engineering design services for the renovation of Archer House; an existing 5-story 35,000 square foot structure that was built in 1966 as a residence hall and converted in 1968 to an office building. AEC was responsible

OSU Archer House Renovation Read More »