Portfolio

Pickaway Correctional Institution

MEP Services Square Footage 0 Construction Cost $ 0 AEC was part of a team that provided architectural and engineering design services for a new 90,000 square foot medical facility and maximum security segregation housing unit. This new facility includes a 14,200 square foot dialysis clinic, a 16,200 square foot segregation housing unit with 60 […]

Pickaway Correctional Institution Read More »

ODOT Yearly Maintenance Contract

MEP Services Square Footage 0 Construction Cost $ 0 AEC was awarded a yearly MEP Engineering Services contract with the Ohio Department of Transportation (ODOT). Services included preparation of engineering reports, drawings, specifications, and plumbing, mechanical and electrical engineering design services for various projects. These engineering services are provided on an “as-needed” basis. A partial

ODOT Yearly Maintenance Contract Read More »

Ft. Stewart Child Development Center

MEP Services Square Footage 0 Construction Cost $ 0 AEC was part of a Design / Build team that was selected to design and construct a 16,000 Square-foot Child Developmental Center and a 20,000 square-foot Youth Center at Fort Stewart, GA. The buildings are to provide programs and services for children ages 6-10 (Child Development

Ft. Stewart Child Development Center Read More »

Wright-Patterson Air Force Base INVENT Building Renovation

MEP Services Square Footage 0 Construction Cost $ 0 AEC was asked to prepare construction documents for the renovation of a building to accommodate the Air Force Research Laboratory’s Integrated Vehicle Energy Technology Demonstration program (INVENT). This project involved the renovation of an existing 240′ x 60′ building constructed in 1927 that was identified for

Wright-Patterson Air Force Base INVENT Building Renovation Read More »

DISA Chiller Replacement

MEP Services Square Footage 0 Construction Cost $ 0 AEC was tasked to design a 2N chiller plant for the Defense Information Systems Agency’s (DISA) Data Center. The work included the addition of a fourth chiller and associated pumps to address the increasing data center loads. Significant modifications were made to the plant including re-

DISA Chiller Replacement Read More »